Approvals5 min read
Building plan approval: a document checklist before you apply
The documents most authorities ask for, and how to avoid delays in getting your plan sanctioned.

You need an approved building plan before construction starts. The exact process differs by city and authority, but most applications ask for a similar set of documents.
Documents usually required
- Title deed or sale deed for the plot
- Khata, property card or equivalent ownership record
- Latest property tax receipt
- Encumbrance certificate
- Approved layout plan, where the plot is in a layout
- Architectural drawings signed by a registered architect
- Structural stability certificate from a licensed engineer
- Owner's ID and address proof
Common reasons for delay
- Design exceeds permitted floor area or height
- Setbacks do not match local rules
- Ownership documents do not match the applicant
- Missing no-objection certificates where required
Requirements vary by authority and change over time. Confirm the current list with your local authority or ask FFK Bricks to check it for your plot.


