Costs6 min read
How much does it cost to build a house? A plain guide to the numbers
What a per sq.ft rate covers, what it leaves out, and how to turn it into a realistic budget for your plot.

Most construction quotes in India are given as a rate per square foot of built-up area. It is a useful starting point, but it only becomes a budget once you know what the rate includes, what it excludes and how much area you are actually building.
Start with built-up area, not plot area
Built-up area is the total floor area you construct, measured to the outside of the walls, on every floor. A 30×40 plot (1,200 sq.ft) does not give you 1,200 sq.ft per floor: setbacks required by local rules reduce the footprint, and balconies, staircases and headrooms add area back.
A quick check: multiply your permitted footprint by the number of floors, then add balconies and the staircase headroom on the terrace. That is the number your rate applies to.
What a package rate usually covers
- Architectural and structural design
- Foundation, columns, beams and slabs
- Walls, plastering and waterproofing
- Electrical and plumbing work up to fixtures
- Flooring, doors, windows and painting to the package specification
- Site supervision and quality checks
What it usually leaves out
- Compound wall and gate
- Underground sump, overhead tank beyond the standard size, borewell
- Approval and authority fees
- Utility connection deposits
- Interiors such as wardrobes and modular kitchens
- GST, in many quotes (FFK Bricks' package rates include it)
Ask for these as separate line items. They can add a meaningful amount to a small house budget.
A worked example
| Item | Basis | Amount |
|---|---|---|
| Construction | 2,400 sq.ft × ₹2,590 (Premium) | ₹62.2 lakh |
| Compound wall | 120 running ft × ₹1,400 | ₹1.7 lakh |
| Sump | Lump sum | ₹1.7 lakh |
| GST | Included in the package rate | Included |
| Total | ₹65.5 lakh |
Where budgets go wrong
The most common cause of overruns is not the rate but the allowances. If tiles are allowed at ₹80 per sq.ft and you choose a ₹150 tile, the difference is yours to pay across every square foot of that floor. Choose finishes early, and check allowances line by line before you sign.
Try the FFK Bricks cost estimator to see an indicative figure for your plot, then ask for a line-item quote.