How we build
Eight stages from plot to keys

Stage 01· Week 1 (typical)
Consultation and site visit
An engineer visits your plot, checks access, levels and setbacks, and listens to what you need from the building.
What we do
- Site survey and photographs
- Check of setbacks and permissible floors
- Soil test recommendation
Your part: Share your plot documents, budget range and must-haves.

Stage 02· Weeks 2–5 (typical)
Design and 3D elevation
Architects prepare floor plans and a 3D elevation, and refine them with you over review rounds.
What we do
- Floor plans and 3D elevation
- Structural design by a licensed engineer
- Electrical and plumbing layouts
Your part: Review plans and give feedback in each round.

Stage 03· Week 6 (typical)
Fixed-price contract
The contract lists every specification, brand and allowance, the payment schedule and the handover date.
What we do
- Line-item specification sheet
- Stage-wise payment schedule
- Project plan with milestones
Your part: Review and sign the contract and specification sheet.

Stage 04· Month 2 (typical)
Excavation and foundation
Marking, excavation and foundations built to the structural drawings and soil test findings.
What we do
- Setting out against approved plan
- Footings and plinth beam
- Anti-termite treatment
Your part: Visit the site and approve the stage before the next payment.

Stage 05· Months 3–5 (typical)
RCC structure
Columns, beams and slabs are cast floor by floor, with curing and de-shuttering on a fixed schedule.
What we do
- Columns, beams and slabs
- Staircase and lift core
- Curing for the specified period
Your part: Approve each slab stage before its payment.

Stage 06· Months 5–7 (typical)
Masonry and plastering
Walls go up, followed by electrical and plumbing conduits, plastering and waterproofing.
What we do
- Block or brick walls
- Concealed conduits and pipes
- Internal and external plaster
- Waterproofing
Your part: Walk through and confirm points for switches, lights and taps.

Stage 07· Months 7–9 (typical)
Flooring, fixtures and painting
Flooring, tiling, doors, windows, fixtures and paint, using the brands in your specification sheet.
What we do
- Flooring and wall tiling
- Doors, windows and hardware
- Sanitary and electrical fixtures
- Painting
Your part: Pick tile, paint and fixture options within your allowances.

Stage 08· Final week (typical)
Handover
A joint snag walk, fixes, deep cleaning and handover of keys and documents.
What we do
- Snag list closure
- As-built drawings and handover documents
- Utility connection support
Your part: Do the snag walk with us and sign off.
Payments
You pay as the building rises
| Stage | Share of contract |
|---|---|
| Booking, during the design phase | 10% |
| Up to plinth: excavation, foundation and plinth beam | 15% |
| Roof slabs, masonry, plastering, flooring, finishing and handover, stage by stage | 75% |
Free consultation
Ready to start stage one?
Tell us where you plan to build. An engineer will call to understand your needs and book a site visit.
- Site visit and plot feasibility check
- Floor plan options and an itemised quote
- No obligation to sign