Eight stages from plot to keys

Every stage has a clear owner and a payment milestone. You always know what is happening on site and what comes next.
  1. Surveyor in a hi-vis jacket and sun hat operating a total station on a tripod on open land

    Stage 01· Week 1 (typical)

    Consultation and site visit

    An engineer visits your plot, checks access, levels and setbacks, and listens to what you need from the building.

    What we do

    • Site survey and photographs
    • Check of setbacks and permissible floors
    • Soil test recommendation

    Your part: Share your plot documents, budget range and must-haves.

  2. Architect's hand sketching a building elevation with a pen next to a scale ruler and a roll of tracing paper

    Stage 02· Weeks 2–5 (typical)

    Design and 3D elevation

    Architects prepare floor plans and a 3D elevation, and refine them with you over review rounds.

    What we do

    • Floor plans and 3D elevation
    • Structural design by a licensed engineer
    • Electrical and plumbing layouts

    Your part: Review plans and give feedback in each round.

  3. Two people shaking hands across a table over a document in a clipboard folder

    Stage 03· Week 6 (typical)

    Fixed-price contract

    The contract lists every specification, brand and allowance, the payment schedule and the handover date.

    What we do

    • Line-item specification sheet
    • Stage-wise payment schedule
    • Project plan with milestones

    Your part: Review and sign the contract and specification sheet.

  4. Worker in a yellow hard hat tying steel reinforcement mesh for a foundation slab

    Stage 04· Month 2 (typical)

    Excavation and foundation

    Marking, excavation and foundations built to the structural drawings and soil test findings.

    What we do

    • Setting out against approved plan
    • Footings and plinth beam
    • Anti-termite treatment

    Your part: Visit the site and approve the stage before the next payment.

  5. Construction site with concrete columns, slab formwork props and workers in hi-vis vests

    Stage 05· Months 3–5 (typical)

    RCC structure

    Columns, beams and slabs are cast floor by floor, with curing and de-shuttering on a fixed schedule.

    What we do

    • Columns, beams and slabs
    • Staircase and lift core
    • Curing for the specified period

    Your part: Approve each slab stage before its payment.

  6. Mason in a head cloth laying red bricks with mortar on a wall

    Stage 06· Months 5–7 (typical)

    Masonry and plastering

    Walls go up, followed by electrical and plumbing conduits, plastering and waterproofing.

    What we do

    • Block or brick walls
    • Concealed conduits and pipes
    • Internal and external plaster
    • Waterproofing

    Your part: Walk through and confirm points for switches, lights and taps.

  7. Close-up of hands applying plaster to a wall with a trowel

    Stage 07· Months 7–9 (typical)

    Flooring, fixtures and painting

    Flooring, tiling, doors, windows, fixtures and paint, using the brands in your specification sheet.

    What we do

    • Flooring and wall tiling
    • Doors, windows and hardware
    • Sanitary and electrical fixtures
    • Painting

    Your part: Pick tile, paint and fixture options within your allowances.

  8. Hand holding house keys on a house-shaped keyring inside a bright home

    Stage 08· Final week (typical)

    Handover

    A joint snag walk, fixes, deep cleaning and handover of keys and documents.

    What we do

    • Snag list closure
    • As-built drawings and handover documents
    • Utility connection support

    Your part: Do the snag walk with us and sign off.

Payments

You pay as the building rises

A 10% booking amount during design, 15% up to the plinth, and the rest stage by stage as the building rises. The exact stages are set out in your contract and can be aligned with your home-loan disbursements.
Stage-wise payment schedule
StageShare of contract
Booking, during the design phase10%
Up to plinth: excavation, foundation and plinth beam15%
Roof slabs, masonry, plastering, flooring, finishing and handover, stage by stage75%

Free consultation

Ready to start stage one?

Tell us where you plan to build. An engineer will call to understand your needs and book a site visit.

  • Site visit and plot feasibility check
  • Floor plan options and an itemised quote
  • No obligation to sign