Skip to content
FFK Bricks

Quoted per project

Industrial sheds & site works

Industrial sites are judged by their floors, roads and drainage as much as by the shed itself. We build the structure, floors and site works together, planned around the loads, vehicles and water your site has to handle.
See our work

Is this for you?

Industrial sheds & site works with FFK Bricks

Steel-roofed sheds, heavy-duty RCC floors, concrete roads, underground tanks and drainage for factories and warehouses.
  • Factory and warehouse sheds with steel roof structures
  • RCC shed floors, levelled and joint-cut
  • Concrete roads, yards and aprons around sheds
  • Underground water tanks and site drainage
Workers fixing steel reinforcement inside the shuttering for an underground tank

From our sites

Industrial sheds & site works on FFK Bricks sites

Photographed on site by our team. Hover to pause; select a photo to view it full size.
All projects

Scope of work

What the service covers

Shed structure

  • Plinth, foundations and plinth masonry
  • Steel roof structure and sheeting
  • Rolling shutters and openings for vehicle access

Floors and roads

  • Base preparation and sheeting before concreting
  • RCC floors, levelled and joint-cut
  • Concrete roads and aprons between sheds

Water and drainage

  • Underground tanks: reinforcement, shuttering and casting
  • Brick drains along sheds
  • Pipework at plinth level

Plan ahead

Things to decide early

Decisions that are cheap to make on paper and expensive to change on site.

Floor loads

Racking, forklifts and machinery decide floor thickness, reinforcement and joint spacing. Share your equipment and storage loads before the floor is designed.

Levels and drainage

Sheds, roads and yards need falls and drains that carry monsoon water away from the plinth. Levels are fixed before the base is laid, not after.

Future extension

If the shed may grow, the foundations, column grid and roof need to allow for it from the start.

How it works

From first call to handover

Full construction process
  1. 01

    Consultation and site visit

    An engineer visits your plot, checks access, levels and setbacks, and listens to what you need from the building.

  2. 02

    Design and 3D elevation

    Architects prepare floor plans and a 3D elevation, and refine them with you over review rounds.

  3. 03

    Fixed-price contract

    The contract lists every specification, brand and allowance, the payment schedule and the handover date.

  4. 04

    Excavation and foundation

    Marking, excavation and foundations built to the structural drawings and soil test findings.

FAQ

Industrial sheds & site works: common questions

Why is industrial work quoted per project?

Spans, floor loads, roofing and site works vary widely, so the price comes from the design and a site survey rather than a per sq.ft rate.

Why are joints cut into a concrete floor?

Concrete shrinks as it dries. Cutting joints at planned spacing makes it crack along straight lines in the joints instead of randomly across the floor.

Free consultation

Ready to start your industrial project?

Tell us where you plan to build. An engineer will call to understand your needs and book a site visit.

  • Site visit and plot feasibility check
  • Floor plan options and an itemised quote
  • No obligation to sign
Projects completed
72+
Projects completed
Years, since 2017
9+
Years, since 2017
Cities served
10
Cities served

Talk to our expert

+91